Vibe-coded CAD
a shape in seconds
geometry and dimensions
a starting point for engineering
Engineering software
Archeion connects requirements, design candidates and physics calculations in one engineering workspace. Understand the trade-offs. Keep the evidence behind every decision.
Get in touchactual computed flow fields · Mach 0.5 → 4.5
01 The gap
A hull, an airframe, a cooling system. The design becomes useful when its performance is tied to the conditions it must meet.
Archeion carries the brief, the calculation and the next design decision through the same workflow.
a shape in seconds
geometry and dimensions
a starting point for engineering
a design with its evidence
the assumptions that change the decision
recorded, inspectable
Product architecture
Signals inform requirements
Decision feedback: revise a candidate or find the missing data.
The brief becomes geometry.
Calculate against the requirements.
Keep the result and its inputs.
Operating tree
01 · Input
It captures the intended function, boundary conditions and hard constraints.
Without it, the system optimizes an unstated problem.
02 · Contract
They turn each claim into a testable quantity, limit and evidence rule.
Without them, passing and failing remain matters of interpretation.
03 · Search
They expose distinct designs to the same declared requirements.
Without them, there is nothing explicit to compare or revisit.
04 · Evaluate
It connects each candidate to its calculations, assumptions and available evidence.
Without it, geometry is mistaken for demonstrated performance.
05 · Decide
It records whether the requirement holds, is refused or remains out of scope.
Without it, results accumulate without a decision boundary.
06 · Next move
It identifies the number or missing fact that would change the verdict.
Without it, the next investigation is chosen by guesswork.
07 · Archive
It binds inputs, methods, sources and results into one inspectable record.
Without it, the reasoning can drift after the decision.
08 · Return
It reruns the same record when evidence, assumptions or methods change.
Without it, revision means rebuilding the argument from memory.
03 Proof
Change a requirement. Compare the candidates. Follow the consequences back to the calculations.
The studies below connect design choices to explicit models, component data and published reference results.
04 Selected work
02 / From a brief to a designLITTORALFit a sampling mission into a transportable design.A 1.60 m platform carrying a 44 kg payload within 0.90 m overall width, with flotation reserve calculated under the stated mass assumptions.Original concept · calculated hydrostatics

Computed Cp field · three mesh resolutions03 / Simulation against evidenceSUBOFFPut the simulation next to the measurements.18 CFD runs, six conditions and three meshes. See which numerical choices bring the model closer to the published reference.CFD study · published reference comparison
Infrastructure illustration04 / Infrastructure decisionsDATA CENTERSFind the constraint before adding capacity.Connect AI load, cooling water, heat recovery and noise. Compare the options that change the next project decision.Four worked infrastructure studies
05 Contact